News Flash

Posted on: September 25, 2020

Important Notice from the Water and Sewer Division - Unidirectional Flushing to Resume on 9/28

Hydrant Flushing Photo

Contractor, Hydra Tech, is scheduled to continue the unidirectional flushing program on Monday, September 28, 2020.  When the unidirectional flushing program was developed, the Town was divided into 12 zones to make managing the program easier. H...

Read on...

Unidirectional Flushing Program Zone Map Water & Sewer Department
Posted on: May 11, 2020

September 25, 2020 Update from the Water & Sewer Division - Route 20 Sewer Project

water logo

J.L Raymaakers began construction on Route 20 (Hartford Turnpike) on May 18, 2020, and has installed approximately 8,300 linear feet of new 6-inch and 8-inch sewer force main from Lake Street to the Worcester city line and on Arrowwood Drive. Installation...

Read on...

Map of Route 20 Sewer System Upgrades Water & Sewer Department
Posted on: September 18, 2020

Important Message from the Water & Sewer Division - Potential for Discolored Water on Friday 9/25

water logo

The Town’s contractor for the Route 20 Sewer Project, J.L Raymaakers, will be pressure testing the new sewer force main on Route 20 today.  They will need to use a hydrant at the intersection of Lakeside Drive and Route 20 to fill the newly insta...

Read on...

Water & Sewer Department
Posted on: July 1, 2020

Important Message from the Water & Sewer Division - Annual Drinking Water Quality Report

water logo

The annual drinking water quality report for calendar year 2019 is now ready and can be viewed at www.shrewsburyma.gov/depreportccr  

This document, also known as the Customer Confidence Report, contains important information about Shrewsbury&...

Read on...

Water & Sewer Department
Posted on: May 1, 2020

Water Use Restrictions

Water pump with text Shrewsbury Water Department and Established 1905 around pump

Water Use Restrictions

Whereas The Board of Selectmen has determined that a shortage of water exists and conservation measures are necessary to ensure an adequate supply of water to all water consumers, and 

Whereas The conditions set forth in the ...

Read on...

Water & Sewer Department
Posted on: June 2, 2020

Shrewsbury Completes Solar Array at Home Farm Water Treatment Plant

Solar array at water treatment plant

In a ceremony in Ware, April 2018, the Baker-Polito Administration, though MassDEP’s Clean Energy Results Program, with support from the Department of Energy Resources and the Massachusetts Clean Energy Center, awarded $4 million in state Gap II...

Read on...

Click here for the project summary Water & Sewer Department