News Flash

Posted on: June 10, 2021

Resurfacing and Miscellaneous Roadway Paving Project

NOTICE TO RESIDENTS

Resurfacing and Miscellaneous Roadway Work including drainage work, milling and paving will be starting approximately June 14th on the following list of streets:

Ireta Road            ...

Read on...

Highway Department
Posted on: March 28, 2019

New Permitting Fee Schedules

New fee schedules for Driveway, Trench on private property and Road Opening Permits have been in effect since January 1, 2019. Click here to see more details.

Click here for more details

Highway Department
Posted on: June 10, 2021

Route 140 Roadwork

MassDOT will be performing interim work to prohibit left turns from entering and exiting Colonial Drive at Route 140 beginning June 18th in the evening. This work includes extending the lane separator system on Route 140 to prohibit these movements and in...

Read on...

Engineering, Planning & Conservation
Posted on: June 10, 2021

Route 140 Roadwork

MassDOT will be performing interim work to prohibit left turns from entering and exiting Colonial Drive at Route 140 beginning June 18th in the evening. This work includes extending the lane separator system on Route 140 to prohibit these movements and in...

Read on...

Home